Renovating a non-collective sanitation system is a regulated project. Here are the mistakes to avoid and the solutions :

o  Not carrying out a hydrogeological study. o  The hydrogeological study will determine the type of work to be carried out depending on the nature of the soil and the space available
o  Installing a system that is inappropriate for the type of soil or the capacity of the home. o  Have the soil study validated by the SPANC before starting the work.
o  Using a works company that is not qualified and/or insured for this type of work. o  Select a competent works company and ask for its ten-year certificate.
o  Neglecting administrative procedures that could delay or compromise authorisation of the work. o  Ensure that the project manager has the work inspected during and at the end of the project, in order to obtain a certificate of compliance from the SPANC.